The exterior CMU walls on the addition have been finished! More underground plumbing lines have been installed on the north side of the addition. Wood blocking is also getting positioned where needed. The next steps of the addition are finishing some interior walls, installing metal framing as well as sheathing, setting door frames, and spraying on the foam/air and vapor barrier.
Out with the old and in with the new! The old asphalt in the parking lots and part of the ring road has been ground up! A new and proper subgrade is being laid down in preparation for the new asphalt.
Out with the old and in with the new! The old asphalt in the parking lots and part of the ring road has been ground up! A new and proper subgrade is being laid down in preparation for the new asphalt.
Out with the old and in with the new! The old asphalt in the parking lots and part of the ring road has been ground up! A new and proper subgrade is being laid down in preparation for the new asphalt.
The Middle School renovation is underway! The major renovation to the bathrooms has begun. The team has demolished the walls, toilets, and sinks in preparation for the new turnout.
The rooftop renovation has begun over the Commons Area, IMC/Tech Center, and Middle School. The ballast has been removed as well as the old membrane and new roof board is being installed.
A new temporary wall has been built by the kitchen area to allow students and faculty to still enter the athletic hallway for Summer School classes. This wall will be a barrier from the ongoing construction happening in the Commons Area.